SKIP TO CONTENT

DJI_0809

September 13th, 2024 |

Assessing breakover of pipe for a safe tie-in following measurement with current trench box considerations.
Assessment of equipment positioning, bell hole integrity and travel lane conditions.

Categories:
Archives: